Our Services

World-Class ESD Control Consulting from a Global Expert

Specialized ESD Solutions for Electronics Manufacturing

ESD Control Program Development

Complete roadmap to ANSI/ESD S20.20 Certified Facility – from gap analysis to full certification.

  • Initial assessment, custom program design, internal standards & EPA layout
  • Product/material qualification, ESD-safe packaging (per S541), equipment recommendations
  • Timeline: 3–12 months (small/mid-size); 12–24+ months (larger organizations) — see co-authored paper on the next generation of S20.20: ANSI/ESD S20.20 - The Next Generation

ESD Training

Virtual & online, standards-focused – turn-key presentations for your internal trainers.

  • Half-day (e.g., STM3.1 ionization), full-day (TR53 verification), two-day (S20.20 program development)
  • Operators, engineers, management, auditors – hands-on demos & certification prep
  • Delivered by an EOS/ESD Association instructor with global experience

Compliance Verification

Detailed audits & ongoing monitoring using TR53 methods and IEC 61340-5-4 guidelines.

  • Full S20.20-compliant reports with findings, recommendations & risk assessment
  • Collaborate with internal coordinators to close gaps, optimize sampling, troubleshoot yield failures
  • Led by WG Chair (WG53/TR53) & Convenor (IEC 61340-5-4)

Specialized ESD Consulting

Advanced troubleshooting, root cause analysis, equipment/material qualification, custom internal standards, footwear/flooring systems, isolated conductors, ionization evaluations.

Full-spectrum ESD expertise from one of the world's top authorities – tailored to your needs.

Typical Program Development Timeline

Small to Mid-Size Companies: 3–12 months to certification readiness

Larger Organizations: 12–24+ months, with phased global rollout

Accelerated by expert guidance, strategic roadmapping, and proven standards leadership.